Public Notice of the Draft Environmental Impact Assessment Report for the Expansion of the Sodium Antimonate Production Project with an Annual Capacity of 2,000 Tons

Category: Blog

Published Time: 2019-05-22

Overview: In accordance with the Measures for Public Participation in Environmental Impact Assessment (Order No. 4 of the Ministry of Ecology and Environment), the draft Environmental Impact Assessment Report for the expansion project of Changsha Yexing Antimony Industry Co., Ltd., which will increase annual production capacity to 2,000 tons of sodium antimonate, is hereby made public as follows: I. Online link to the full text of the draft EIA report, along with details on how and where to access the hard copy: Full-text online link: https://pan.baidu.com/s/1AH88SVwiz_h47YRobkKaUg (Extraction code: q008). Method for accessing the hard copy: Ningxiang City Economic and Technological…

In accordance with the Measures for Public Participation in Environmental Impact Assessment ( Ministry of Ecology Order No. Number 4 ) of Regulation, Now To Changsha Ye Xing Antimony Industry Co., Ltd. Expansion of annual production capacity 2,000-ton sodium antimonate production project Environmental impact Draft of the Evaluation Report for Public Comment phase Public Information Officer Example As follows:

I. Online link to the full draft of the Environmental Impact Assessment Report, along with methods and channels for accessing the hard copy of the report.

Full text of the draft for public comment:

https://pan.baidu.com/s/1AH88SVwiz_h47YRobkKaUg (Extraction code: q008 ).

Methods for accessing the paper report: Dongsheng Road, Ningxiang Economic and Technological Development Zone No. 129, Changsha Yexing Antimony Industry Co., Ltd. Second floor Office

II. Scope of the Public Involved in Soliciting Opinions

Primarily the public groups affected by the project, including those living in the vicinity of the plant site. Within a 5-kilometer radius of citizens and Factory premises Nearby organizations and groups.

III. Online link to the public comment form: https://pan.baidu.com/s/1dRUnu6BhwU6nt6SbxLuaEg ( Extraction code: yuw8 ).

IV. Methods and Channels for Public Comment

The public may submit completed public comment forms to us by mail, fax, email, or other means, expressing their views and suggestions related to the environmental impacts of the proposed project.

V. Period for Public Submission of Comments

Public notice period: From the date of this announcement onward. Within 10 business days

VI. Contact Information

Contact information of the construction entity:

Manager Lü 13257312838   Fax: 0731- 87870622   Email: cslvbaer@163.com

Contact information for the environmental impact assessment agency:

General Manager Fu  15388086876   Fax: 0731-82985802    Email: lhtzhnfgs@163.com